Operational Update – Sapphire 6
The second lateral well in the Sapphire #6 pilot set drilling programme, has been successfully drilled to total depth and intersected the Sapphire 6V vertical well as planned. The well drilled 1,336 metres of horizontal in seam section having run and cemented 7” casing at 336 metres in the “build section” of the well.